19 19 Page 18 JH Fletcher Co cannot anticipate every mine hazard that may develop during use of these products Follow your mine plan andor roof control plan prior to use of the product Proper use maintenance and continued use of OEM original equipment parts will be essential for maximum operating results 2014 JH Flet cher Co All Rights reserved wwwjhfletchercom 3045257811 salesjhfetchercom www facebookcomJHFletc herMiningEquipment GE T THE MAN OFF THE MUCKPIL E The Narrow Fletcher Model N3114ADE Roof Bolter is designed for bolting in stope conditions as narro w as 65 2 m This mac hine fnally pr esents narro w stope mines with the opportunity to r eplace jac klegs and get the man off of the muc kpile Drilling r esin insertion and bolting is all done from the canop y protected oper ator s bask et that is mounted on a boom that lifts and swings to allo w multiple installations Bask et swing allo ws par allel offset and maneuvering around tight cor ners Maninbask et design allo ws maximum versatility in bolt type and length Designed to allo w access to tr am compartment and drill platfor m from both sides of mac hine Hea vyduty system assur es long life Maximum r eliability and productivity Diesel tr amelectric drill with inc h tr am capability from bolting platfor m stillwaterMiningLifeindd 1 7242014 42915 PM Contd on pg 20 By Frank Giorno Glencore s Sudbury Integrated Nick el Operation SINO has committed itself to nickel production in Sudbury for the next 20 years with a US 700 million investm ent in the Craig mine Onaping Depth project The future of Sudbury INO is deep mining and our ability to adapt to it company ofcials say in their May 2018 report to the Sudbury commu nity Faced with the reality that existing ore bodies are nearing their end we have been working on the develop ment of two mine projects Onaping Depth and Nickel Rim Depth with the Onaping Depth Project now fully approved for further development Currently Glencore has two under ground nickelcopper mines in Sud bury Nickel Rim South and Fraser The Nickel Rim South mine is cur rently Sudbury s lar gest mining op eration SINO currently employs approximately 1300 permanent em ployees and has more than 500 con tractors Glencore s community report also cites the creation of 8000 indirect jobs because of its employe es pur chasing products and services in the Sudbury area In 2017 the amount of money it spends on total wages and operations by Glencore stands at 514 Million Canadian Onaping Depth is a rich orebody boasting grades of 225 per cent nickel and one per cent copper but it s grades of that value that make the project worth pursuing given the ex pense of operating at depths of 25 ki lometres 2018 will see the start of construc tion on an internal shaft at the Onaping Depth followed by under ground in frastructure in the years to follow The internal shaft will extend from 1200L 3937 ft to 2630L 8628 ft An extensive exploration program identifed and defned the Onaping Depth deposit including the Main and South East zones Glencore has been studying the Onaping Depth between 19992012 They have conducted a scoping study feasibility study and a second scoping study The assessment of geotechnical risks at depth heat im pacts at depth and global economics prevented full approval of the project until now The project includes the construction of a winze from the 1200metre level laterally of the workings of Craig Mine to access some 14 million tonnes of ore 2500 metres from surface The frst 700 metres of the winze will be raise bored down to the 1900metre level and then slashed and extended beyond that to the 2650metre level using conventional shaft sinking tech nology The project also includes all ofshaft development and associated ore han dling systems First production from Onaping Depth will occur in 2023 and full production by 2025 Glencore needs the ore to replace declining re serves at its Nickel Rim South and Fraser Mines Onaping Depth will come in at a time when existing mines are tailing of and this will secure business in Sudbury well into the 2030s which is critic al for Glencore s Sudbury In tegrated Nickel Operation s future in the Sudbury basin Mining at Nickel Rim South is sched uled to cease in 2022 and the Fraser mine in 202425 Electric Car Battery The Onaping Depth Project once completed will extend the mine life until 2035 and provide feed for the Sudbury Mill and Smelter over this same period It will also be an enabler for additional exploration and devel opment of new mines such as Nickel Rim Depth Late 2017 present Full project ap proval was received with develop ment continuin g to the internal shaft access Major components such as the hoist were ordered Detailed engi neering was initiated for all aspects of the project 2018 W ill see the excavatio n of the hoisting plant and start of the internal shaft sinking along with completion of detailed engineering and continued procurement of required materials for the safe execution of work The Onaping Depth operation will be all electric because the costs for ven tilation at depths of 1900 6233 ft to 2650 8694 ft metres would be pro Page 19 JH Fletcher Co cannot anticipate every mine hazard that may develop during use of these products Follow your mine plan andor roof control plan prior to use of the product Proper use maintenance and continued use of OEM original equipment parts will be essential for maximum operating results 2014 JH Flet cher Co All Rights reserved wwwjhfletchercom 3045257811 salesjhfetchercom www facebookcomJHFletc herMiningEquipment GE T THE MAN OFF THE MUCKPIL E The Narrow Fletcher Model N3114ADE Roof Bolter is designed for bolting in stope conditions as narro w as 65 2 m This mac hine fnally pr esents narro w stope mines with the opportunity to r eplace jac klegs and get the man off of the muc kpile Drilling r esin insertion and bolting is all done from the canop y protected oper ator s bask et that is mounted on a boom that lifts and swings to allo w multiple installations Bask et swing allo ws par allel offset and maneuvering around tight cor ners Maninbask et design allo ws maximum versatility in bolt type and length Designed to allo w access to tr am compartment and drill platfor m from both sides of mac hine Hea vyduty system assur es long life Maximum r eliability and productivity Diesel tr amelectric drill with inc h tr am capability from bolting platfor m stillwaterMiningLifeindd 1 7242014 42915 PM