Page 22 Contd from pg 21 be used in the prefeasibility study Permitting and a production decision at Broken Hammer are expected in 2012 Surrounding the resource W allbridge s Broken Hammer prop potential for lar ge highgrade copper PGE footwall deposits similar to V ale s recent Capre discovery KGHM s recent Mor rison Deposit discovery and the footwall portion of Xstrata s Nickel Rim South Mine On its 77 owned W i sner Joint V e nture with Xstra ta Nickel which is adjacent to the Broken Hammer new copper PGE occurrences within a 600metre long trend near the previously known Southwest copper PGE zone The new copper PGE occurrences were found by prospecting over a number of shallow IP geophysics anomalies that have not been tested by drilling Me chanical stripping and further sampling was planned to better expose the new copper PGE occurrences and to evaluate them for drilling On the W allbridge Impala Parkin Of fset Joint V e nture a 5000 metre drilling program is ongoing to followup recent high grade drilling results at the Milnet 1500 Zone beneath the pastproducing Milnet Mine Recent new modelling of borehole electromagnetic geophysics indicates the main con ductive body has a minimum strike length of 300 metres with a number of smaller conductive re sponses nearby On the Parkin Of fset dyke the Milnet Mine reported past production of 157130 tons averaging 225 gt platinum 298 gt palladium 093 gt gold 149 nickel and 154 copper The Milnet 1500 Zone was discovered by drilling beneath the Milnet Mine in 2009 when drill hole WMM014 intersected 1424 metres containing 150 gt platinum 252 gt palladium 399 gt gold 078 nickel and 257 copper from 149966 to 151390 metres down hole The Parkin Of fset Dyke hosts platinum palladium nickel copper and gold mineralization typical of other of fset dykes in Sud bury with examples at V ale s Copper Clif f North and South Mines and V ale s T o tten Mine develop ment Exploration is at an early stage and the Parkin The W allbridge Lonmin Sudbury Camp Joint V e n ture SCJV is exploring for PGE copper and nickel deposits on 7 W allbridge properties in Sudbury The SCJV completed 8 drill holes totalling 2545 metres testing various tar gets as part of its 2012 program The new W allbridge Lonmin North Range Joint elected to exercise its option to earn into 14 of W all bridge s properties in the North Range of the Sud bury area by funding exploration for PGE copper and nickel Field programs are currently underway The NRJV properties include over 56 km of Of f set dykes mostly discovered by W allbridge in re cent years Several properties include disseminated posed at surface within inclusion bearing phases of the quartz diorite Of fset dykes in areas with very little drilling