Belte r r a Cor p or at ion S afety M an ual D oc I D C H S M BE L 2 0 1 7 Pa g e 3 21 of 53 8 Doc u m e n t Identif icat ion S W P 010 P age Nu m b e r 2 of 6 Doc u m e n t C r e ation Dat e F e bru a r y 02 2016 Im p le m e n tat ion Dat e Ma rc h 16 2016 I f maintena n c e c le a nin g or a djust ments a re r e quir e d while e quipm e nt i s in o pe ra ti on sa f e wor k proc e dur e s mus t be de ve l ope d identif y in g e a c h st e ps on how the wor k c a n be c ompl e ted sa fe l y Empl o y e e s w orkin g on t he se mac hines must be p rope rl y tra ined All proc e dur e s mus t be e a sil y a c c e ssi ble to wo rke r pe rf o rming wo rk on thi s mac hine REL E ASE F ROM L OCK OUT T AG OUT B e fo re lockout or t a g out devic e s a re r e moved a nd e ne r g y is re sto re d to t he mac hine or e quipm e nt inspec t t he wor k a re a to e nsure that none ss e nti a l i tems ha ve be e n re moved a nd to ensur e that mac hine or e quipm e nt c o mponents a re ope ra ti ona l l y int a c t C he c k wor k a re a to e nsur e that a ll e mpl o y e e s t oo ls ar e in t he c le a r Notif y a f fe c ted e mpl o y e e s that L OT O de vice s sh a ll be re moved Ea c h L OT O d e vice sh a ll be re moved fr om ea c h e n e r g y isol a ti ng d e vice b y t he e mpl o y e e who a ppli e d the de vice The e ne r g y isol a ti ng de vi c e s ma y be op e ne d or c lo se d ie c irc uit br e a ke rs to re store e n e r g y to e quipm e nt G E NERA L I f ther e is a potential f or e x posure to ot he r e ne r g y sourc e s wh e re the re is e x posure fr om pre ssure in li ne s or w he re the s y stem c ould ca use movem e nt of the c omponents the f ol lowing is re quir e d a s a mi nim um Dr a in and ble e d off li ne s L oc kout a nd ta g pumpi ng or c ompre ssi on c ontrol C lose va lves be twe e n th e pump and y ou a nd lock a nd ta g these va lv e s W ork ma y be p e rf o rme d on por table t y p e e le c tric a l m a c hiner y a fte r it ha s b e e n unplu gg e d f rom the powe r sour c e a nd th e plug ta gge d out a D a n g e r Do not Ope ra t e ta g T he plug shoul d r e main visi ble to the ta gg e r a t all ti mes W he re ther e is a h a z a rd o f f ire or e x plosi on or e lec tric a l a rc in g is a c on c e r n for a n y othe r r e a son g round in g will be r e quire d a s pa rt of lockout pr o c e dure s W he n wor king on a ir ope ra ted ma c hin e r y it shoul d be disconne c ted fr om a ir suppl y a nd a ta g plac e d a t t he c onne c ti n g point I f the m a c hiner y is c onne c ted to a n a ir supp l y b y fix e d pipi ng a t