6 50 STORMT ANK MODULE PLACEMENT 1 Inst all geo textile f abric and liner ma terial if required as speci ed a G e o t extile f abric shall be plac ed per geo textile f abric manuf ac t u rer s rec ommenda tions b A n impermeable liner may be inc orpor a t ed to prev ent in ltr a tion If speci ed the liner must be inst alled per liner manuf ac t u rer rec ommenda tions 2 Mark the f o o tprint o f the modules f or plac ement a E nsure module st arting point is square prior to Module plac ement this will ensure proper lay out o f unit s b C a re should be t a ken to no te any c onnec tions port s debris ro w s or o ther irregular unit s to be plac ed 3 Inst all the individual modules b y hand as det ailed belo w a T he modules should be inst alled as sho wn in the S t ormT ank submitt al dr awings with the short side o f perimeter modules f acing outward exc e p t as o therwise required b Make sure the topbo ttom pla tens are in alignment in all direc tions c F or double st ack c o n gur a tions 25 S eries ONL Y I Inst all the bo ttom module r s t DO NO T INTERMIX V ARIOUS MODULE HEIGHT S A CROS S LA YER S II Insert st acking pins 2 per module into the top pla ten o f the bo ttom module III P lac e the upper module direc tly on top o f the bo ttom module in the same direc tion making sure to engage the pins 4 Inst all the modules to c ompletion t aking c a re to av oid damage to the geo textile and or liner ma terial