2 CONTENT General Note s 10 Module A s sembly 20 B asin E x c a v a tion 30 S ubgr ade R equirement s 40 L e v eling B ed Inst alla tion 50 Module P lac ement 60 S ide B ack ll 70 T op B ack ll 80 S uit able C ompac t able F ill A ppendix A B e aring C a pacity C alcula tion A ppendix B L o ad R a tings A ppendix C A c c e p t able F ill Ma terials A ppendix D Module 25 S eries D ebris R o w 1 R e view inst alla tion proc edures and c oordina te the inst alla tion with o ther c onstruc tion ac tivities such as gr ading exc a v a tion utilities c onstruc tion ac c e ss erosion c o ntrol etc 2 E ngineered dr awings super sede all pro vided document a tion as the inf orma tion furnished in this document is based on a typic al inst alla tion 3 C oordina te the inst alla tion with manuf ac t u rer s represent a tiv e distributor to be on site to review inst alla tion instruc tions 4 C omponent s shall be unloaded handled and stored in an area pro t ec ted from tr a f c in a manner to prev ent damage and UV degr ada tion 5 A s sembled modules may be walked on but v ehicular tr a f c is prohibited until back lled per Manuf ac t u rer s requirement s 6 E nsure all c onstruc tion oc cur s in ac c o rdanc e with F eder al S t a t e and L o c al L a w s Ordinanc es R egula tions and S a f e ty R equirement s 7 E xtr a c a re and c aution should be t a ken when temper a t ures are a t or belo w 40 F 44 C 8 Check f or any damaged ma terial report damage to a S t ormT ank R epresent a tiv e A ll plastic wr ap should be remo v ed to prev ent damage from hea t or UV 9 T he S t ormT ank Module c arries a L imited W arr anty which c an be ac c e ssed a t www stormt ank c om