15 appendix D Module 25 serie s DEBRIS R O W T he op tional S t ormT ank Module D ebris R o w pro vides a solution to tr apping sediment Observ a tion cleanout port s are to be inst alled with a minimum o f one port a t the in o w pipe loc a tion B a sed upon D ebris R o w size and shape additonal port s may be required S ee the appro v ed submitt als f or debris ro w size and loc a tion 1 Inst all D ebris R o w side panels in the modules adjac ent to the D ebris ro w per the appro v ed plans 2 Inst all a lay er o f geo textile ac cross the bo ttom o f the D ebris R o w extending up the side panels o f the adjac ent modules G e o t extile F abric is to be inst alled to the height speci ed b y the hy drogr aph elev a tion o f the selec ted storm per the engineer o f rec o rds plans or a minimum o f 12 3048mm whichev er is grea ter S e cure the geo textile f abric to the side panels with zip ties 3 P lac e and inst all the D ebris R o w Modules in the appropria te loc a tion per the appro v ed S t ormT ank submitt al dr awings 4 F inally make any nec essary c onnec tions and c omplete the s y s tem inst alla tion per the S t ormT ank inst alla tion instruc tions No te F or Module 20 S eries c o nt ac t a S t ormT ank R epresent a tive