Town of Lakeshore The Town of Lakeshore s wastew ater tr eatmen t plan t is located in Woodslee Mem o rial Park Th e low profile building is located on the b a nks of the B e lle River Th e 50000 gpd system i s com p rised of a p r imary clarifier four stage RB C final clarifi er sand filter and ultraviol e t disinfection The plan t discharges direc t ly to the Bell e River No by pass facilities have been in cluded in the design Duri ng periods of exce ssiv e flows c a u s ed b y severe r a ins the plant was able to process all flows The stability of the biom ass precludes wash out due to hydraulic sur g es of ben e fi cial microorg a nism s th at perform the p u rification process The proj ect in stall a tion wa s managed by the Ontari o Clean Water Agency and e n gineered by Tot t en Sim s Hubicki Assoc i ate s The tr eatmen t plan t is comple tel y enclosed n o i s e and odour free The RBC is power e d by a five hor s ep ower electric motor It typ i cally has l o w power consumption thereby reducing operating costs consider ably The filter s ar e pump fed by small submersible p u mps loc a ted in the final cl arifier St Thomas of Villan o va The E s sex C o unty Cath olic School Bo ard chos e the RBC process to service this 20 00stud ent secondary school Bosc ariol and Associates e n gineered the treatme n t works The 3 0 000 gpd treatment pl ant consi s ts of a primary clarifier four stag e RBC final clarifier filter an d ultraviole t disi nfection Th e plant disch a r g es to a stor m sewer at th e side of th e road The RBC proc ess is not adv e rsely aff e cted by lengthy school closur es or v a riable daily loading s Represented By Publication Number 251 4