TS X A GI N YS E A GI 27 Y oung Da vidson low er mine e xpan sion in t he final s t ag es 8990 Cr u sh e r Sev e r al critic al p a th it e ms r e ce n tl y c omp le t e d Mai n r amp t o th e low er min e inf r as tr u ctu r e c omp le t ed 8 9 4 0 le v el loa d in g p ock e t in clu d in g th e c on v e y or an d or e w as t e b in s c omp le t ed r eady f or c omm is si on in g 8 9 3 0 le v el or e an d w as t e loa d ou t su b s t an ti al ly c omp le t e I n s t al la ti on of the han g er s an d tr a y s f or the main c on v e y or fr om th e cr u sh er loa d ou t le v el t o th e t op of the sha ft bin s ar e tw o th ir d s c omp le t e C ru sh er in s t al la ti on c omp le t e an d r eady f or c omm is si on in g Skip s r op es an d sh a ft bot t om s t ee l h as b ee n r emo v ed fr om th e mi d sha ft loa d in g p ock e t P en ti ce sepa r a ti n g u p p er an d low er p or ti on s of Nor th g a t e sh a ft d ri ll ed of f b la s t ed an d r emo v ed mi d A p ri l w it h gr ou n d su p p or t n ow c omp le t e